Installation and replacement process of basin support

Source:Jiangsu Wanbao      Release date: 2021-05-21
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, whic
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, which has attracted wide attention from the industry.
1. Determine the principled jacking plan based on the actual situation, that is, partial jacking or overall jacking. The advantage of local jacking is that it is easy to control the jacking and reduce equipment investment; the disadvantage is that jacking can easily lead to large deformation of the beam and a long construction period. The advantage of overall jacking is that it is easy to control the stress in the beam and the construction period is shorter, but more jacking equipment and personnel are required, and it is difficult to coordinate and control the deformation of various parts during the jacking process. If the design permits, try to give priority to partial jacking.
2. Calculate the theoretical jacking reaction force value of each part according to the beam structure form and design parameters, and determine the appropriate number and model of jacks according to the reaction force. The basic principles of "large size, moderate quantity, and controllable grading" should be followed when selecting models.
Large: It means to choose a jack model with a larger safety reserve factor as much as possible. For example, when choosing a jack, ensure that the actual jacking force is less than 75% of the theoretical jacking force.
Moderate quantity: It means that it is not advisable to use more jacks to achieve the requirement of total jacking force, and at the same time, it should not be too few, that is, there should be at least one jack on both sides of each support. More jacks will make it difficult to work together, and too few jacks will cause difficulty in starting or once an individual jack fails, it will affect the entire jacking process.
Hierarchical controllable: The jacking equipment with synchronous jacking information control system or the jack equipment with throttle control should be preferred to realize jacking synchronization or difference limit control.
3. It is necessary to choose the setting position of the jacking point reasonably to avoid local damage of the concrete. According to the design drawings, the top surface of the jack should be arranged within the beam, or the lifting surface should be adjusted to within the beam by means of beams or longitudinal beams. If conditions permit, the jack should be arranged near the support position on the cover beam. The force-bearing surface should adopt wedge iron, with a large force-bearing area, adjust the vertical and horizontal slope of the bottom of the box girder to ensure that the jack can apply force vertically.
4. When the space between the cover beam and the bottom of the beam cannot meet the jack layout requirements, a bearing column should be used as the back of the jack. When the pier column is not high, the bearing column should be placed on the cap, otherwise the foundation should be handled well to ensure that the strength and deformation of the foundation meet the lifting requirements. When the pier column is too high or the water pier should adopt the hoop method, the bearing column should be placed on the hoop corbel. The design of the bearing column should ensure sufficient strength and rigidity. The load-bearing column should preferentially adopt the steel pipe form.
5. In the jacking plan, the command and dispatch, information transmission, and feedback mechanism in the jacking process should be formulated in detail to ensure that the entire process is strictly controlled. Priority should be given to the use of walkie-talkies for synchronous information transmission, and the responsibilities and division of labor of management and operators at all levels should be clearly defined.
6. The jacking plan should clarify the emergency control measures for various risks, formulate several sets of emergency adjustment plans, implement them according to the favorable plan, and prepare according to the unfavorable plan to prevent serious quality accidents or safety accidents.
7. The lifting plan should clarify the control methods and measures for the synchronous displacement or the difference limit during the lifting process, and supplement it with real-time monitoring and measurement of displacement, stress, strain, etc. when necessary to ensure the safety of the existing beam.

8. The method of removing the old support and installing the new support shall be described in detail in the jacking plan. In particular, the installation process methods of the new bearing installation and the bridge construction are very different due to the constraints of different conditions in different periods. There may be local adjustments of the bearing installation method, which should be clarified in the plan.

Basin support

欧美日韩日本国产_男女拍拍免费视频30分钟_91热国内精品永久免费观看_一区二区三区日本视频
亚洲小视频在线| 国产精品网站在线播放| 欧美日韩中字| 国产亚洲一区二区三区在线观看| 中文欧美日韩| 欧美成人精品一区二区| 国产精品亚发布| 欧美一二三区精品| 欧美日本不卡| 在线欧美不卡| 欧美激情一区二区三区 | 黄色国产精品| 久久久国际精品| 欧美午夜视频在线观看| 亚洲午夜激情免费视频| 欧美寡妇偷汉性猛交| 国产亚洲欧美中文| 久久久97精品| 国产精品嫩草99a| 亚洲免费在线看| 欧美日韩成人在线播放| 在线日韩一区二区| 欧美激情aⅴ一区二区三区| 国产专区欧美精品| 久热精品在线| 国外视频精品毛片| 理论片一区二区在线| 国产欧美日韩免费看aⅴ视频| 欧美影院精品一区| 国产精品久久福利| 欧美在线免费观看| 国产欧美一区二区精品性| 久久久久久穴| 国产一区二区高清| 免费欧美电影| 亚洲无限乱码一二三四麻| 欧美片网站免费| 亚洲综合丁香| 国产精品麻豆va在线播放| 久久久国产精品一区| 国产日产欧产精品推荐色| 久久久亚洲人| 好吊日精品视频| 国产伪娘ts一区| 国产一区二区精品| 久久人人爽人人| 国产日韩成人精品| 久久久一区二区三区| 国产亚洲福利社区一区| 麻豆freexxxx性91精品| 国内精品久久久| 欧美理论电影在线观看| 亚洲一区二区三区高清| 欧美丝袜第一区| 激情综合电影网| 精品999在线播放| 麻豆精品一区二区综合av| 国产视频在线观看一区二区三区| 欧美xart系列高清| 国产一区二区福利| 欧美国产一区二区在线观看 | 欧美激情第4页| 国产日韩综合| 另类综合日韩欧美亚洲| 在线激情影院一区| 国产精品久久久久久久久久ktv| 久久久久久久999| 好吊色欧美一区二区三区四区 | 性色av一区二区三区| 国产乱码精品1区2区3区| 欧美91大片| 亚洲欧美精品suv| 国产亚洲在线观看| 欧美日韩精品是欧美日韩精品| 久久精品在线免费观看| 尤物九九久久国产精品的特点| 欧美日韩综合不卡| 久久婷婷蜜乳一本欲蜜臀| 亚洲自拍电影| 国产在线精品一区二区中文| 欧美性猛片xxxx免费看久爱| 麻豆成人在线| 欧美一区激情| 尤物精品国产第一福利三区 | 久久九九热免费视频| 中文精品视频| 国产精品永久免费在线| 欧美另类高清视频在线| 久久久综合精品| 亚洲欧美日韩人成在线播放| 韩国自拍一区| 国产伦精品一区二区三| 欧美少妇一区| 欧美—级在线免费片| 久久综合国产精品| 欧美一区二区三区视频在线观看 | 国产亚洲视频在线| 国产精品久久久久久久第一福利 | 尤物网精品视频| 国产亚洲成av人片在线观看桃| 欧美日韩亚洲另类| 欧美第一黄网免费网站| 久久久精品五月天| 小处雏高清一区二区三区| 亚洲视频在线观看视频| 国内精品视频久久| 国产欧美日韩三区| 国产精品天天看| 国产精品免费电影| 欧美视频日韩视频在线观看| 欧美久久99| 欧美激情欧美狂野欧美精品| 久久综合色播五月| 久久视频一区二区| 久久久久久色| 久久午夜精品一区二区| 久久九九精品| 久久久欧美一区二区| 久久久女女女女999久久| 久久精品99无色码中文字幕| 欧美在线亚洲| 久久久91精品| 老司机67194精品线观看| 久久综合色婷婷| 欧美r片在线| 欧美高清免费| 欧美激情视频在线免费观看 欧美视频免费一 | 国产区精品在线观看| 国产精品福利在线观看| 欧美日韩一区二区三区在线视频 | 久久亚洲国产精品一区二区| 欧美在线不卡| 久久狠狠一本精品综合网| 欧美亚洲网站| 久久福利毛片| 久久久久亚洲综合| 久久综合成人精品亚洲另类欧美| 老牛嫩草一区二区三区日本 | 在线看国产日韩| 亚洲制服少妇| 欧美在线视频免费观看| 久久久久久久久久久成人| 久久久之久亚州精品露出| 男人插女人欧美| 美女精品国产| 欧美激情小视频| 麻豆久久婷婷| 欧美激情亚洲国产| 欧美日韩人人澡狠狠躁视频| 欧美午夜视频在线观看| 国产精品一区二区三区久久| 国产一区二区三区奇米久涩 | 久久精品国产99精品国产亚洲性色| 欧美有码在线视频| 久久尤物电影视频在线观看| 欧美成人官网二区| 欧美日韩一区三区| 国产精品视频免费观看| 国产亚洲一区精品| 亚洲中字在线| 久久久亚洲国产美女国产盗摄| 欧美国产亚洲另类动漫| 国产精品大全| 国内精品久久久久久久影视麻豆 | 欧美激情视频一区二区三区不卡| 欧美日韩在线免费观看| 国产欧美一区二区三区另类精品| 韩国av一区二区三区| 亚洲综合三区| 看欧美日韩国产| 欧美视频在线观看| 国产专区精品视频| 欧美亚洲视频在线看网址| 免费成人美女女| 国产精品久久久久久久7电影 | 久久全国免费视频| 欧美人与禽性xxxxx杂性| 国产日产欧美精品| 亚洲欧美久久久| 免费欧美日韩| 国产精品色网| 亚洲综合成人婷婷小说| 玖玖玖国产精品| 国产精品久久福利| 在线观看三级视频欧美| 久久久久久久欧美精品| 欧美日韩一区二区三区高清| 国产综合色产| 久久久久国产一区二区三区四区| 欧美日韩在线不卡| 在线播放日韩| 蜜臀va亚洲va欧美va天堂| 国产精品欧美日韩一区二区| 亚洲性图久久| 欧美99在线视频观看| 国产欧美日韩另类一区| 欧美一区二区成人| 欧美日韩另类一区| 狠狠色综合播放一区二区| 久久久久九九视频|